Last week, Governor Nathan Deal announced the comprehensive list of infrastructure and maintenance projects made possible through the Transportation Funding Act of 2015. Flanked by legislators and Georgia Department of Transportation representatives, Deal announced a finalized 18-month project list, roughly $2.2 billion worth of investment, as well as a 10-year list, totaling more than $10 billion.
Along with Deal’s announcement, GDOT Commissioner Russell McMurry spoke about the importance and scale of reducing the backlog of maintenance requirements. “Over the next 18 months, GDOT will deliver contracts that resurface nearly 2,500 miles of roads, replace more than 100 bridges, and provide critical rehabilitation to more than 300 bridges. Our first priority is to take care of the existing transportation system which is reflected in our vision for the next decade and beyond.”
The map of the next 18 months worth of projects is packed with dots representing bridges, intersections or signals and resurfacing efforts. Nearly every bridge on I-75 from Cartersville south to Atlanta, I-75 from Tifton south to Valdosta and on I-85 from Columbus to Atlanta will be replaced. Bridge replacement will also be a prominent feature on all of I-95 in Georgia.
The ten year plan will see considerable changes on the interstates around Atlanta. The existing express lanes on I-85 into Gwinnett will be expanded to beyond I-985, north on I-75 beyond I-575 and 575 itself, as well as on I-75 south to near SR 155. Proposed express lanes include all of I-285 north of I-20 and GA-400 up to McGinnis Ferry Road. Truck only lanes will be installed on 75 from SR 155 to I-475. The source of much frustration, the downtown connector, is currently under study.
GDOT issued a Request for Qualifications in April of last year to investigate different options for the connector. The wide ranging request laid out a variety of options for improvement, including additional lanes (somewhat limited on the boxed-in connector), tunnels, double-decked roadways, tolling and alternate routes (apparently I-285 is not sufficient).
The ten year plan also lists specific projects across the state. Most of the proposals are relatively simple widening projects. US 441 is slated to be widened in at least 10 locations from the North Carolina border all the way down to Florida. Highways US- 1 and SR 133 are also scheduled for widening projects in a variety of areas. There are also several bypass projects that should draw some traffic away from heavy areas outside of Rome, Kingsland, Sparta and Milledgeville.
Deal’s statement also noted the importance of the legislature in the process. “One year ago, I stood before the General Assembly and urged members to prioritize Georgia’s transportation needs,” said Deal. “In order to maintain our roads and bridges, improve congestion and accommodate the movement of freight traffic, we could no longer afford to kick the can down the road. Legislators on both sides of the aisle took action, working together to pass legislation addressing these critical needs. Today, we are delivering on our promise.”
Read more here: http://www.dot.ga.gov/IS/TFA



